HMS Collingwood

The total refurbishment of a two storey Building (1000m2)  at HMS Collingwood, Fareham, to create a test facility for the Aircraft Carrier Alliance ( Client ) to house an integrated Internal Network Electronics ( the ship’s computer control system ).

All the core processing equipment designated for the new Aircraft Carrier ‘HMS QUEEN ELIZABETH’.

Complete building strip-out including waste management and asbestos clearance.

Construction of lightweight partitioning, to form offices.

To design and install bespoke suspended ceilings to accommodate the air conditioning, lighting system and the Network Electronics containment / wiring without compromising on the high quality finish.

A total of 300kW of bespoke air conditioning systems including close control systems  into seven test rooms and temperature control to open plan operation room.

Construction of new raised access flooring system throughout to facilitate the Naval power supplies and also act as the ventilation plenum for the A/C systems.

HV sub-station serving new facility.

Full Electrical Installation design and construction, including 50 / 60Hz Mains distribution for Naval equipment, Lighting , Emergency lighting, Power, full bespoke metal cable management installation and Fire Alarm system.

Installation of Class B Secure wall systems, internal & external security doors including electronic access, CCTV and security systems.

Complete telephone and data distribution systems.

Full design and interior decorations throughout.

Complete design & installation of soft furnishings and bespoke furniture.

Design and construction of  an exhibition room and a management viewing. room.